Electric multi-turn servo drive SO 2-A

Electric multi-turn servo drive SO 2-A

Typové číslo: 062
Industry use: Energy
Enclosure: IP 67
Trip torque: 5 to 100 Nm
Rebuild speed: 10 to 40 min−1
Scope of work. of revolutions: 0.5 to 500
Weight: 12 to 18.5 kg
Ambient temperature: -50 to 55 °C
Connecting flange: F07, F10
Work position: any

Hi, my name Is Marko. I will be happy to help/advise you

Ing. Marko Čižmárik

Standard equipment

  • Supply voltage 230 V AC, 3x400 V AC
  • Terminal connection
  • 2 torque switches
  • 2 position switches
  • 2 additional position switches
  • Mechanical connection - flange F10 (ISO 5210)
  • Heating resistor with thermal switch
  • Local locator
  • Manual control

Advanced equipment

  • Supply voltage 220 V AC, 3x380 V AC
  • Position transmitter with signal:
    • resistance 1x100 Ω, 1x2000 Ω
    • current 0/4 to 20 mA from R/I converter (with/without source)
    • current 4 to 20 mA (DCPT 2 transmitter with/without source)
  • Mechanical connection:
    • ISO 5210, form A
    • DIN 3338, form C
    • other non-standard

Similar products

Wedge, lid or yoke sliders

Light: DN 50, DN 600 Work pressure: PN 16 Operating temperature: 70 °C Connection parameters: PN EN 1092-2, ISO 7005-2 Construction length acc: ANSI B16.1, flange design EN 558, series 15, DIN 3202-1/F5, welding version EN 12 982, series 15, (DIN 3202-1/S8)
Light: DN 50, DN 600 Work pressure: PN 16 Operating temperature: 70 °C

Knife sliders

Light: DN 50, DN 1000 Work pressure: PN 10/16 Operating temperature: 70 °C Connection parameters: PN EN 0192-2, DIN 2501 Materials: Monolith body - ductile iron EN-GJS-400-15 (GGG-40), Wedge – fully rubberized with antibacterial EPDM, NBR, Spindle - corrosion-resistant steel 1.4021 (13% Cr), O - rings - NBR, Spindle nut – forged brass
Light: DN 50, DN 1000 Work pressure: PN 10/16 Operating temperature: 70 °C

Soft-sealing wedge sliders

Light: DN 40, DN 1200 Work pressure: PN 10/16 Operating temperature: 70 °C Connection parameters: EN 0192-2 with flanges type 21, shape B Construction length acc: 15 – according to PN-EN 558+A1, F5 (DIN 3202), 14 – according to PN-EN 558+A1, F4 (DIN 3202)
Light: DN 40, DN 1200 Work pressure: PN 10/16 Operating temperature: 70 °C

Category products

Electric multi-turn servo drive SO 2-A

Industry use: Energy Enclosure: IP 67 Trip torque: 5 to 100 Nm Rebuild speed: 10 to 40 min−1 Scope of work. of revolutions: 0.5 to 500
Industry use: Energy Enclosure: IP 67 Trip torque: 5 to 100 Nm

Electric multi-turn servo drive MO 3-A

Industry use: Energy Enclosure: IP 67, IP 55 Trip torque: 25 to 250 Nm Rebuild speed: 10 to 95 min−1 Scope of work. of revolutions: 1.4 to 685
Industry use: Energy Enclosure: IP 67, IP 55 Trip torque: 25 to 250 Nm

Electric multi-turn servo drive MO 4-A

Industry use: Energy Enclosure: IP 67, IP 55 Trip torque: 120 to 500 Nm Rebuild speed: 16 to 180 min−1 Scope of work. of revolutions: 1 to 685
Industry use: Energy Enclosure: IP 67, IP 55 Trip torque: 120 to 500 Nm

Electric multi-turn servo drive MO 5-A

Industry use: Energy Enclosure: IP 67, IP 55 Trip torque: 250 to 1000 Nm Rebuild speed: 15 to 100 min−1 Scope of work. of revolutions: 1.25 to 500
Industry use: Energy Enclosure: IP 67, IP 55 Trip torque: 250 to 1000 Nm

Multi-turn electric servo drive UM 1-A

Industry use: Energy Enclosure: IP 68 Trip torque: 4 to 64 Nm Rebuild speed: 10 to 80 min−1 Scope of work. of revolutions: 3.125 to 160
Industry use: Energy Enclosure: IP 68 Trip torque: 4 to 64 Nm

An important fact of reliable operation is not only the correct design of fittings and servo drives, but also their subsequent care. With regular inspections and planned maintenance, you will prevent malfunctions and thus increase the reliability of the operation and extend its service life. For this purpose, the company REGADA also offers you comprehensive care of servo drives in your operation or just a selection from some of the listed services:

  1. Supervision during the first start-up of actuators in operation
  2. Connection and testing of actuators
  3. Connections and start-up of Rematic actuators - instruction
  4. Attaching the actuators to the valves and starting them
  5. Maintenance of actuators and periodic inspections
  6. Post-warranty repairs at the customer
  7. Post-warranty repair offer in Regada
  8. Training of service personnel
  9. Spare parts